汽轮机热力设备安装工程计算规则
发表:admin 来源:本站更新 点击:5179 更新时间:2014-11-10

一:汽轮发电机设备安装
1、汽轮机本体安装按机型型号,以“台”为计量单位。
2、发电机本体安装区别不同型号,以“台”为计量单位,其范围包括发电机及主、副励磁机的安装。
3、备用励磁机安装区别不同型号,以“台”为计量单位,其范围包括电动机、励磁机检查、安装。
4、汽轮机本体管道安装区别不同机组容量及全套管道重量,以“套”为计量单位。
5、汽轮发电机整套空负荷试运转以“台”为计量单位。
6、给水泵、循环水泵、凝结水泵区别不同容量及型号,以“台”为计量单位。
7、凝汽器、除氧器及水箱、加热器、抽气器、冷油器、主油箱、滤油器、滤水器等的安装,按机组配备和型号以“台”为计量单位。

Turbine generator equipment installation
1, steam turbine installed according to the model, with "Taiwan" as the units of measurement.
The installation of 2, a generator body difference of different types, with "Taiwan" as the units of measurement, including the scope of its generator and main, auxiliary exciter installation.
3, spare Li Ci machine installation difference of different types, with "Taiwan" as the units of measurement, its scope includes motor, Li Ci machine inspection, installation.
4, turbine piping installation different unit capacity and a full set of pipe weight, in order to "set" as the units of measurement.
5, steam turbine generator set of empty load test run to "Taiwan" as the units of measurement.
6, water pump, circulating water pump, condensate pump different capacity and models, with "Taiwan" as the units of measurement.
7, condenser, deaerator and water tank, a heater, air pump, main oil tank, oil cooler, oil filter, water filter installation, press unit equipped with and models with "Taiwan" as the units of measurement.
(二)燃料供应设备安装
1、皮带输送机按一套基本长度10m计算。超出10m时,10m以外的部分执行“皮带输送机中间构架安装”项目。
2、皮带输送机中间构架安装,是按供货考虑的,设计要求现场配制的,另行计算所需材料及其配制费。
3、配仓皮带输送机按一套基本长度10m计算。超出10m时,10m以外的部分执行“皮带输送机中间构架安装”项目。
4、输煤转运站落煤设备以“t”为计量单位,包括落煤管及挡板等的重量。
5、碎煤机、电磁分离器、电动卸料车、犁式卸煤器安装以“台”为计量单位。
6、龙门式、桥式抓斗及斗链卸煤机均以“台”为计量单位。不包括行走轨道安装,其工程量应按相应子目另行计算。
7、油过滤器、燃油加热器安装以“台”为计量单位。

(two) fuel supply equipment installation
1, the belt conveyor is calculated by a basic set of length 10m. Beyond 10m, except the 10m part of the execution "installation" belt conveyor middle frame project.
2 installation of belt conveyor, the middle frame, according to the supply is considered, the design requirements of compounding, separately calculate the required material and its preparation fee.
3, the bunkering of belt conveyor is calculated by a basic set of length 10m. Beyond 10m, except the 10m part of the execution "installation" belt conveyor middle frame project.
4, coal transfer station coal drop device to "t" as the units of measurement, including the coal drop pipe and baffle plate weight.
5, the coal breaker, electromagnetic separator, electrical dumper, plough type coal unloading device installed in the "table" as the units of measurement.
6, Longmen type, bridge type grab bucket chain unloader and are in the "table" as the units of measurement. Does not include walking track installation should be calculated according to the corresponding item, the quantity of the project.
7, oil filters, fuel heaters installed with "Taiwan" as the units of measurement.
 
(三)水处理专用设备安装
1、钢筋混凝土类工艺流程装置安装均以“台”为计量单位,其计算范围包括:池内机械、设备检查安装、调整,池体内的钢制平台、扶梯、栏杆、反应室、导流窗、集水槽、取样槽及各种管子、管件、阀门等的安装,但不包括钢制平台、扶梯、栏杆、集水槽、取样槽的配制。
2、澄清设备、机械过滤器、电渗析器的安装均以“台”为计量单位。执行机械过滤器安装项目时,不同型式的排水系统及不同填料高度不得换算。
3、软化器安装以“台”为计量单位。
4、衬胶离子交换器以“台”为计量单位。
5、阴阳离子交换器的树脂装填高度,每增加1m,项目基价乘以系数1.3,增加数量不足1m时,不得调整。
6、体内再生的阴阳混合离子交换器执行“阴阳离子交换器”安装相应子目,其基价乘以系数1.1;体外再生的阴阳混合离子交换器、逆流再生或浮床运行的设备执行估价表,不得调整。
7、体外再生罐安装,带有空气擦洗装置等设备时,基价乘以系数1.1。
8、除二氧化碳器安装以“台”为计量单位,且包括除碳风机的安装。但不包括风道平台、扶梯、栏杆的制作与安装,其填料高度以各子目中规定为基准,每增加1m,基价乘以系数1.2,增加量不足1m时不得调整。
9、水箱安装以“台”为计量单位,如需现场制作时应另执行制作项目。
10、其他水处理设备安装均以“台”为计量单位。
11、酸碱贮存罐安装中不包括内外壁的防腐工作。
12、搅拌器安装,带有电动搅拌装置时,基价乘以系数1.2。
13、喷射器安装包括支架的配制及安装。
14、泡沫吸收器安装中不包括烟道的安装。
15、取样冷却器安装中不包括取样架的配制及安装。
16、油处理设备安装以“台”为计量单位,其范围包括设备、设备支架、框架、平台、扶梯、栏杆的安装,不包括其制作。

(three) special equipment installation of water treatment
1, concrete process equipment installation are the "table" as the units of measurement, the calculation range includes: pool machinery, equipment check installation, adjustment, the tank body of the steel platform, ladder, handrail, a reaction chamber, guide window, water collecting tank, a sampling groove and all kinds of pipes, pipe fittings, valves etc. the installation, but does not include the preparation of steel platform, ladders, railings, a header tank, sampling tank.
2, to clarify the equipment, mechanical filters, electrodialysis device is arranged to "Taiwan" as the units of measurement. When the installation project of mechanical filter implementation, drainage systems of different types and different packing height shall not be converted.
3, softener installed with "Taiwan" as the units of measurement.
4, the rubber lining ion exchanger with "Taiwan" as the units of measurement.
Resin loading height 5, anion exchanger, each increase of 1m, the project price multiplied by the coefficient 1.3, increase the number of less than 1m, shall not be adjusted.
6, the in vivo regeneration cation anion exchanger performing "anion exchanger" install the appropriate subheadings, its price multiplied by the coefficient 1.1; cation anion exchanger, counter current regeneration or floating bed operation of in vitro regeneration device execute valuation table, the adjustment shall be.
7, in vitro regeneration tank installed with air scrubbing device, base price multiplied by the coefficient 1.1.
8, carbon dioxide removal device installed in the "table" as the units of measurement, and includes carbon removing blower installation. But not including the fabrication and installation of air platforms, escalators, railing, the filler height to each subheading in provisions for reference, for each 1m increase in price by a factor of 1.2, increasing the amount of less than 1m shall not adjust.
9, the water tank is installed with "Taiwan" as the unit of measurement, such as the need to field production should be another executive production project.
10, the other water treatment equipment is installed with "Taiwan" as the units of measurement.
11, acid and alkali storage tank anticorrosion work both inside and outside the wall does not include the installation of.
12, a stirrer is installed, with an electric stirring device, the base price multiplied by the coefficient 1.2.
13, the injector installation includes preparation and mounting bracket.
Install 14, bubble absorber flue not included in the installation.
15, sampling cooler does not include the preparation and mounting the sampling frame installation.
16, oil processing equipment installation "Taiwan" as the units of measurement, including the scope of its equipment, equipment support, framework, platform, staircase, handrail installation, not including its production.